Ferrum Build

We build and manage construction projects

Ferrum Build is a construction company. Our own team builds, and our own software plans, checks and bills the work. Hire us to manage, to build selected packages, or to deliver the whole building.

Service areas are confirmed when you enquire.

What we do

Execution and project management together

  • We build

    Our own site team does the work. Specialist or overflow packages go to subcontractors we check first, under the same supervision.

  • We manage

    Planning, scheduling, supervision and quality checks at set hold points, whoever does the work: us, our subcontractors or your contractor.

  • We certify before you pay

    Measurements and bills are checked against the agreed scope before payment is due. Each milestone bill follows a passed quality check.

Services

Manage, build selected packages, or build it all

Modes can be combined on one project: for each work package we agree who builds it, who supplies the material and whether we manage it.

Project management only

You keep your own contractor and buy materials through your own contacts. We plan, supervise, check quality and certify your contractor's measurements and bills before you pay them.

Who builds
Your contractor
Who supplies material
You
What Ferrum does
  • Plan and schedule the work, stage by stage
  • Supervise on site and run quality checks at each hold point
  • Verify your contractor's measurements against the agreed scope
  • Certify each bill before you pay it
  • Track materials you supply for quantity, delivery and wastage
How it is billed
Your contractor bills you directly. Ferrum charges a project management fee, agreed in your contract.

Selected work packages

We build only the packages you choose, such as the structure, waterproofing or electrical work. The rest can stay with your own contractor, with or without our project management.

Who builds
Ferrum for the packages you pick; your contractor for the rest
Who supplies material
Agreed package by package
What Ferrum does
  • Build and supply the packages you pick
  • Quote only those packages
  • Optionally manage and certify the packages your contractor builds
  • Run quality checks on every package we manage
How it is billed
We invoice only our own packages, plus the management fee where you choose it.

Full turnkey

We build and supply everything, from site setup to handover, under one contract and one point of accountability.

Who builds
Ferrum, with subcontractors we check before engaging
Who supplies material
Ferrum, using the materials and brands you choose in the quote
What Ferrum does
  • Build every package, from site setup and foundations to finishes
  • Supply materials in the brands and grades you choose
  • Run quality checks at every hold point
  • Hand over with a snag list, as-built documents and warranty terms
How it is billed
Milestone bills, each raised when a stage passes its quality check.

Work packages

Every project is split into packages

For each package we agree who builds it, who supplies the material and whether Ferrum manages it. Only the packages your building and its system need are used.

Kinds of work

New build
A new building from an empty site.
Extension
Adding floors or area to an existing building, after an engineer reviews the existing structure.
Renovation and fit-out
Reworking interiors, services and finishes in an existing shell.
Repair and rehabilitation
Fixing damage or deterioration, with the approach decided by an engineer's assessment.
Maintenance
Planned upkeep of a completed building.

In the project app

What you see as the client

How this worksThis is how the service is set up to work. Parts of the client app are still being built; your project manager shares the rest with you directly, and at enquiry we tell you which parts are available.
  • Progress

    AppLIVE

    A stage timeline with planned and actual dates, and photo updates from site. Dates come from what is recorded on site, not from estimates.

  • Quality check results

    AppLIVE

    For each stage, the checklist the engineer worked through, the photos taken and who signed it off. A stage that fails its check stays open until it is fixed and checked again.

  • Milestone billing

    AppLIVE

    Payments are tied to construction stages set out in your contract. A milestone bill is raised only after its stage passes the quality check.

  • Certified bills

    AppLIVE

    Where your own contractor bills you, you see each bill with the measurements we verified and our certification before you pay.

  • Changes you approve

    A change to the scope becomes a priced variation. No extra work starts and no extra charge is added until you approve it.

Sectors

Buildings we take enquiries for

Homes, commercial buildings, institutions, industrial and logistics buildings, and mixed use. Each is planned as work packages suited to its use and construction system.

Residential

Homes for individual owners and developers, and residential renovation.

  • Individual houses
  • Villas
  • Apartments
  • Group housing
  • Hostels
  • Residential renovation

Commercial

Buildings and interiors for businesses.

  • Offices
  • Retail and showrooms
  • Restaurants
  • Hospitality
  • Commercial fit-outs

Institutional

Buildings for education, health and the community.

  • Schools
  • Colleges
  • Training facilities
  • Healthcare buildings
  • Community and public facilities

Specialist approvalsSpecialist systems and statutory approvals are handled by named competent professionals appointed on the project. Our software records their approvals; it never stands in for them.

Industrial and logistics

Buildings for making, storing and moving goods, with their offices and services.

  • Factories
  • Workshops
  • Warehouses
  • Sheds
  • Associated offices and services

Mixed use

Buildings that combine the uses above, each part with its own package requirements.

  • Shops below homes
  • Offices with retail
  • Other combinations of the above

Scope

The kinds of buildings we take enquiries for, not a claim of completed work in each. Whether we can take on your project in your area is confirmed when you enquire; specialist and infrastructure enquiries are reviewed case by case.

Construction systems

The right way to build each part

Concrete or steel frames, factory-made parts, or brick by brick. What each system is, where it is used, and what we check on site.

Engineering sign-offThe system for your building is chosen with your structural engineer, and each system keeps its own sequence: a steel shed is not scheduled like a concrete house. Our checklists organise the work on site; they do not perform or certify structural design, which is signed off by a qualified engineer.

RCC (reinforced cement concrete)

A frame of columns, beams and slabs made by pouring concrete around steel reinforcement on site. The most common way to build homes and many other buildings.

Commonly used for: Houses, apartments, offices, schools and most multi-storey buildings.

What we check on site

  • Work to approved drawings and their latest revision
  • Reinforcement and formwork inspected before each pour
  • Concrete pour and test records
  • Curing, then stage measurements

Structural steel

A frame of steel sections that are fabricated, then bolted or welded together on site. It spans long distances and goes up quickly once the parts arrive.

Commonly used for: Large-span halls, multi-storey commercial frames, mezzanines and extensions.

What we check on site

  • A named party responsible for the design
  • Approved shop drawings before fabrication
  • Traceable materials, coating and inspection records
  • Anchor and interface checks, then the erection sequence and installation checks

PEB (pre-engineered building)

A steel building whose frame, roof and wall sheeting are designed and made as a system by a manufacturer, then erected on prepared foundations.

Commonly used for: Warehouses, factories, workshops and sheds.

What we check on site

  • Design responsibility and approved drawings from the manufacturer
  • Fabrication release and dispatch records
  • Anchor bolt and foundation interface checks
  • Erection sequence and installation checks

Precast concrete

Concrete parts such as walls, slabs or beams cast in a factory or yard, then lifted into place and joined on site.

Commonly used for: Repetitive buildings, boundary walls, and parts where site casting is slow or hard.

What we check on site

  • An approved panel and element schedule
  • Factory inspection before dispatch
  • Dispatch and receipt records
  • Lifting and assembly, then joint and weatherproofing checks

Modular prefab

Rooms or panels built off site and assembled on site. "Prefab" is not one material: each project names what the modules are made of, such as light steel, concrete or timber.

Commonly used for: Site offices, hostels, clinics, classrooms and quick-turnaround buildings.

What we check on site

  • An approved module schedule that names the material and system
  • Factory inspection before dispatch
  • Interface and tolerance checks
  • Assembly, then joint and weatherproofing checks

Masonry

Walls of brick, block or stone laid in mortar. Walls either carry the building's load themselves or fill in a concrete or steel frame.

Commonly used for: Low-rise homes, boundary walls and the infill walls of framed buildings.

What we check on site

  • Material checks on the bricks or blocks delivered
  • Line, level and bond checks as walls rise
  • Openings, lintels and ties placed to drawings
  • Curing and stage measurements

Hybrid

Two or more systems in one building, for example an RCC ground floor with a steel roof, or a steel frame with precast floors.

Commonly used for: Buildings where different parts are best built in different ways.

What we check on site

  • A named owner for every interface between systems
  • Sign-off at each hand-off from one system to the next
  • Shared foundations and finishes counted once, not twice

Process

From enquiry to handover

Every project follows the same path, in this order. Each step is recorded, so you can see what was agreed, what was checked and what was billed.

  1. Step 1: Enquiry

    Tell us about the building: its use, location, approximate area, stage and which service mode you are considering. We confirm whether we can serve your area.

    You receive a reference only once your enquiry is saved.

  2. Step 2: Site visit

    An engineer visits to record measurements, photos, access and ground conditions. The visit report becomes part of your project record.

    A visit request is a request until we confirm a time with you.

  3. Step 3: Reviewed scope and quote

    We agree the work packages and who does each one. Quantities come from your frozen drawings, and prices come from dated, sourced supplier prices. You choose brands and grades and see how each choice moves the total.

    Early figures are estimates. A quote is not issued while a required price is missing or out of date, and every revision is kept.

  4. Step 4: Contract

    The agreement sets out the scope, the price, how price changes are handled, and a payment schedule tied to construction stages.

  5. Step 5: Build with quality hold points

    Work proceeds stage by stage. At each hold point a quality engineer checks the work against its checklist, with photos, before the next stage starts.

    Changes to scope need your approval before any extra work or charge.

  6. Step 6: Milestone billing

    When a stage passes its quality check, its milestone bill is raised. Where your own contractor bills you, we verify the measurements and certify the bill first.

  7. Step 7: Handover

    A snag list, a final inspection, as-built documents and the warranty terms from your contract. Warranty claims after handover are tracked to closure.

Start

Tell us about your project

Share what you plan to build and how you want to work with us. We confirm whether we can serve your area before anything else.