Company
Ferrum OS, the company
Ferrum OS is pre-launch: the table below shows what exists today, product by product.
What exists today
Products and their status
Generated from the feature registry that the product pages, the home page and SUTRA read, not typed by hand.
| Product | Available | Test mode | Roadmap |
|---|---|---|---|
| LandIntel | 33 | 1 | 29 |
| DesignStudio | 51 | 1 | 20 |
| Structura | 5 | 5 | 7 |
| BOQ Pro | 12 | 0 | 3 |
| ProMarket | 1 | 0 | 6 |
| Ferrum Projects | 120 | 26 | 32 |
| Procura | 35 | 8 | 4 |
| InvestFlow | 4 | 0 | 3 |
| CommunityBuild | 0 | 9 | 4 |
| Transact | 2 | 2 | 4 |
| Ten products, 427 product features (platform adds 57; 484 registry features in all) | 263 | 52 | 112 |
Available means a control exists in this preview. It does not mean the control uses live data: several available features use preliminary or unavailable data, as their descriptions on the product pages say. Roadmap means not yet built or not yet connected.
Repository history
How Ferrum OS came together
Only entries we can cite against the repository's own commit history — each one names the commit date and SHA on origin/main it is drawn from. It records when code landed in the repository, not customer-facing product launches or general availability.
- 2026-08-27
Ferrum OS monorepo initialized
From the repository history, 2026-08-27 (commits 500a5f904 and 5ca83b251): the repository structure was initialised, then a documentation system and logging scripts were added.
- 2026-08-29
First landed feature branches
From the repository history, 2026-08-29 (commit d82a3d624): the first branches landed to main under the fleet’s [land:] convention, including an early LandIntel live/fallback chip (commit c7d1c6746).
- 2026-08-30
Resources hub pages landed
From the repository history, 2026-08-30 (commit c4c3d7c3c): the /resources section layouts landed.
- 2026-09-01
Structura and BOQ Pro pages landed
From the repository history, 2026-09-01: a Structura product page (commit 2642fb8d4) and a BOQ Pro product page (commit 109c8a68c) landed to main.
Careers
Open roles
No open roles have been published, so no roles, requirements or locations are listed.
Open roles: UNAVAILABLE (to be published).
Email contact: UNAVAILABLE until the operator publishes the address.
Partners
Programme terms
No partner programme has been published, so no tiers, terms, fees or timelines are listed.
Partner programme terms: UNAVAILABLE (to be published).
Email contact: UNAVAILABLE until the operator publishes the address.
Get in touch
Send us a message
Office address and phone: UNAVAILABLE (to be published).
Email contact: UNAVAILABLE until the operator publishes the address.