Concrete Pour Readiness Checklist

Confirming a Pour Is Actually Ready Before It Starts

Checklist · 3 sections · 12 items

Formwork and Reinforcement

  • Formwork designed against a calculated lateral pressure for the actual pour rate and mix
  • Rebar cover, spacing, and lap lengths checked against approved drawings
  • Construction joints and waterstops positioned per the approved pour sequence
  • Formwork ties, bracing, and shoring inspected and signed off

Concrete and Site Conditions

  • Mix design confirmed against the approved specification for this pour
  • Slump and temperature test plan agreed with the batching plant
  • Ambient temperature and weather forecast checked against pour window
  • Pour rate and sequence communicated to the pump and placing crew

Sign-Off and Records

  • Pre-pour inspection checklist signed by site engineer and QA/QC
  • Curing method and duration confirmed and resourced before the pour starts
  • Test cube schedule set and labelled for this pour
  • As-poured record (date, mix, volume, weather) filed against the pour location