Crane Lift Plan Checklist

Planning and Signing Off a Lift Before the Crane Moves

Checklist · 3 sections · 12 items

Lift Planning

  • Load weight, centre of gravity, and rigging configuration confirmed against the crane's rated capacity
  • Ground bearing capacity checked against outrigger loads for the planned crane position
  • Lift radius and boom angle confirmed against the load chart for the actual configuration
  • Exclusion zone defined and communicated to all site personnel before the lift

Pre-Lift Checks

  • Rigging gear (slings, shackles, spreader bars) inspected and rated for the load
  • Weather conditions (wind speed, visibility) checked against the crane's operating limits
  • Signaller and operator communication method confirmed and tested
  • Overhead and underground services checked and cleared from the lift path

Sign-Off and Records

  • Lift plan reviewed and signed by a competent person before the lift proceeds
  • Operator certification and crane inspection/load-test certificate current and on file
  • Any deviation from the planned lift logged and re-approved before proceeding
  • Post-lift record completed, including any incident or near-miss noted during the operation