Handover Documents Checklist

The Document Package a Clean Project Handover Actually Needs

Checklist · 3 sections · 12 items

Design and As-Built Records

  • Final approved drawings reconciled against as-built condition, all disciplines
  • Structural, MEP, and finishes as-built drawings cross-checked against each other
  • Design change log closed out with sign-off on every variation
  • Digital copy of the approved building plan and occupancy certificate filed

Compliance and Certification

  • Structural completion certificate signed by the engineer of record
  • Fire and life-safety system commissioning certificates on file
  • Statutory approvals and NOCs collected against the handover checklist
  • Warranty and maintenance documentation handed over for major systems

Owner Handback

  • Defects register closed out or carried into a post-handover punch list
  • Keys, access credentials, and system manuals transferred and logged
  • Final handover walkthrough completed with owner sign-off
  • Document package archived in a location accessible to the owner going forward