Material Receiving Checklist

Verifying What Actually Arrives on Site

Checklist · 3 sections · 12 items

Delivery Verification

  • Delivery note quantities checked against the purchase order before offload
  • Material grade, size, and specification confirmed against the order, not just the label
  • Visible damage or contamination noted and photographed before acceptance
  • Mill test certificates or compliance documents collected for structural materials

Storage and Handling

  • Material moved to the correct storage location per its storage requirement (dry, raised, covered)
  • Batch or lot numbers recorded and traceable to the storage location
  • Stock rotated on a first-in-first-out basis where shelf life or curing time applies
  • Storage area protected from the specific degradation risk for that material (moisture, UV, contamination)

Records and Discrepancies

  • Goods-received note completed and matched against the delivery and purchase order
  • Any shortage, damage, or non-conformance logged and reported to procurement same day
  • Compliance documents filed against the batch for later traceability
  • Rejected material clearly tagged and segregated pending return or disposal decision