Monsoon Preparedness Audit Guide
Getting a Site Ready Before the Rains Start, Not After
Guide · 3 sections · 12 items
Site Drainage and Water Management
- Site drains checked and cleared, confirmed to carry water away from footings and structures
- Excavations and open trenches assessed for flooding and side-collapse risk
- Temporary works checked for scour risk at footings and shoring
- Pump and dewatering equipment tested and staged before the rains start
Materials and Storage
- Cement and moisture-sensitive materials moved to raised, ventilated, covered storage
- Steel stock protected against surface corrosion during extended wet periods
- Formwork and temporary works inspected for water-related degradation risk
- Electrical installations and temporary power checked for water ingress protection
Schedule and Safety Readiness
- Pour schedule reviewed against the monsoon forecast, with wet-weather contingency built in
- Safety briefing delivered on wet-weather site hazards (slips, exposed excavations, electrical)
- Emergency contact and evacuation plan confirmed for flood-prone site areas
- Site access roads assessed and reinforced where waterlogging is likely