Monsoon Preparedness Audit Guide

Getting a Site Ready Before the Rains Start, Not After

Guide · 3 sections · 12 items

Site Drainage and Water Management

  • Site drains checked and cleared, confirmed to carry water away from footings and structures
  • Excavations and open trenches assessed for flooding and side-collapse risk
  • Temporary works checked for scour risk at footings and shoring
  • Pump and dewatering equipment tested and staged before the rains start

Materials and Storage

  • Cement and moisture-sensitive materials moved to raised, ventilated, covered storage
  • Steel stock protected against surface corrosion during extended wet periods
  • Formwork and temporary works inspected for water-related degradation risk
  • Electrical installations and temporary power checked for water ingress protection

Schedule and Safety Readiness

  • Pour schedule reviewed against the monsoon forecast, with wet-weather contingency built in
  • Safety briefing delivered on wet-weather site hazards (slips, exposed excavations, electrical)
  • Emergency contact and evacuation plan confirmed for flood-prone site areas
  • Site access roads assessed and reinforced where waterlogging is likely