Scaffold Handover Checklist

Confirming a Scaffold Is Ready Before It's Handed Over for Use

Checklist · 3 sections · 12 items

Structural Sign-Off

  • Scaffold erected per the approved design and loading class for its intended use
  • Base plates, sole boards, and ties inspected and confirmed against the design
  • Bracing complete and secure at all required locations
  • Scafftag or equivalent inspection tag current and displayed at access points

Access and Safety

  • Guardrails, toe boards, and platform decking complete with no gaps
  • Access ladders secured and extending the required height above the platform
  • Load capacity signage displayed and visible at each level
  • Exclusion zone and public protection measures confirmed where scaffold is near a public area

Records and Handover

  • Handover inspection completed and signed by a competent person
  • Weekly inspection schedule confirmed and responsibility assigned
  • As-erected drawing or design reference filed against the scaffold record
  • Client or site team briefed on load limits and any use restrictions before handover