Site Handover Playbook
A Working Guide to Closing Out a Project Cleanly
Guide · 3 sections · 12 items
Before the Handover Meeting
- Structural, MEP, and finishes as-built drawings reconciled and complete
- Defects register closed out, or every open item scheduled with an owner and date
- Statutory approvals, certificates, and occupancy documents collected
- Warranty and maintenance documentation assembled by system
At the Handover Walkthrough
- Owner walkthrough covers every floor and system, not a sample
- Load limits, use restrictions, and maintenance obligations communicated verbally and in writing
- Keys, access credentials, and system manuals transferred and logged item by item
- Any punch-list item raised during the walkthrough logged with a committed close-out date
After Handover
- Document package archived in a location the owner can access without contacting the contractor
- Post-handover punch list tracked to closure, not left open indefinitely
- Defect-liability period start date confirmed in writing with both parties
- A single point of contact named for any post-handover issue during the defect-liability period