Site Handover Playbook

A Working Guide to Closing Out a Project Cleanly

Guide · 3 sections · 12 items

Before the Handover Meeting

  • Structural, MEP, and finishes as-built drawings reconciled and complete
  • Defects register closed out, or every open item scheduled with an owner and date
  • Statutory approvals, certificates, and occupancy documents collected
  • Warranty and maintenance documentation assembled by system

At the Handover Walkthrough

  • Owner walkthrough covers every floor and system, not a sample
  • Load limits, use restrictions, and maintenance obligations communicated verbally and in writing
  • Keys, access credentials, and system manuals transferred and logged item by item
  • Any punch-list item raised during the walkthrough logged with a committed close-out date

After Handover

  • Document package archived in a location the owner can access without contacting the contractor
  • Post-handover punch list tracked to closure, not left open indefinitely
  • Defect-liability period start date confirmed in writing with both parties
  • A single point of contact named for any post-handover issue during the defect-liability period