Skip to main content

Structural Punch List Checklist

A Closeout Checklist for Structural Handover

Checklist · 3 sections · 12 items

Foundation and Substructure

  • Footing dimensions and reinforcement match approved structural drawings
  • Anchor bolt positions verified against column base plate templates
  • Waterproofing membrane continuous at all foundation penetrations
  • Backfill compaction test reports on file for each lift

Superstructure and Frame

  • Column and beam cover blocks intact, no exposed reinforcement
  • Construction joints treated per approved method statement
  • Slab levels within tolerance at all structural grid intersections
  • Shear wall and bracing connections torqued to specification

Closeout and Handover

  • As-built structural drawings reconciled against site measurements
  • Non-destructive test reports (rebound hammer, UPV) archived with location tags
  • Defects register closed out or carried into the defect liability schedule
  • Structural completion certificate signed by the engineer of record

Stay in the loop on new product releases.